Technical Summary

The Technical Department has completed the design and installation of electrical infrastructure for a temporary structure at The Lanesborough Hotel in London. The project, executed with Solid Collective, features a fully reversible installation designed to remain in place for approximately three years.

Original Reporting Excerpt

The Technical Department (TTD) has completed the design and installation of the electrical infrastructure for a new t structure at The Lanesborough Hotel in London, working alongside lead creative production company and principal contractor Solid Collective. Designed to remain in place for approximately three years, the structure required a complete electrical installation capable of supporting... The post TTD works with Solid Collective to deliver fully reversible electrical infrastructure for

Source: Electrical Times

Read the Complete Story

This report was originally published by Electrical Times. Visit their official publication for full details.

Read on Electrical Times ↗