TRACKER // BS 7671 AMENDMENT STATUSBS 7671:2018+A4 TRANSITION UNTIL OCT 2026
BS 7671 Amendment Tracker
Factual reporting on what changed and when. Not advisory - no compliance checklists, no "what you must do" guidance.
TRANSITION PERIODPublished 15 April 2026
BS 7671:2018+A4 - Current Amendment
Amendment 4 is published and in its transition period through October 2026. What it changes is set out on the Amendment 4 page, sourced from the IET and BSI announcement and the certification bodies' summaries.
A note on what this tracker covers
Each amendment has its own page, and that page is the one home for what the amendment changed. This index carries dates and links only, so the two cannot drift apart.
Section 722 and EV charging did not change in Amendment 4. Those requirements arrived with Amendment 1 in February 2020 and were consolidated into Amendment 2 in March 2022.
Timeline
15 Apr 2026 Amendment 4 published
Oct 2026 Transition period ends - full enforcement
Archive - Previous Amendments
IN FORCEPublished 2024
Bidirectional protective devices, for installations feeding power back into the supply.
IN FORCEPublished 28 March 2022
Arc fault detection devices in higher-risk buildings, a new chapter on prosumer installations, transient overvoltage protection, and revised labels and notices. Absorbed Amendment 1.
IN FORCEPublished February 2020
The standalone EV charging amendment: Section 722, including the revised Regulation 722.411.4.1 rules on PME earthing.
Last updated: 23 August 2026