The Regulatory Status of BS 7671

BS 7671 is a non-statutory national standard. It is given statutory evidential weight through citations in legislation, notably the Electricity at Work Regulations 1989 (via HSE Guidance HSR25), the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, and Approved Document P of the Building Regulations.

Amendment 4 was published by the IET and BSI on 15 April 2026. Following the standard six-month industry transition period concluding on 15 October 2026, previous editions (BS 7671:2018+A2:2022+A3:2024) were formally withdrawn by the BSI. For all new design, installation, and alteration work commenced after this date, BS 7671:2018+A4:2026 is the current national benchmark.

Crucially, BS 7671 is non-retrospective. An existing installation that complied with the regulations in force at the time of construction does not require upgrading simply because a newer edition exists. However, duty holders maintain continuous statutory obligations under EAWR 1989 Regulation 4(1) (construction) and Regulation 4(2) (maintenance) to prevent danger, so far as is reasonably practicable.

EICR Defect Coding and Periodic Inspection

Industry discussions surrounding Amendment 4 have focused heavily on model forms and inspection reporting:

  • Code C1 (Danger Present): Immediate risk of injury; produces an Unsatisfactory assessment.
  • Code C2 (Potentially Dangerous): Urgent remedial action required; produces an Unsatisfactory assessment.
  • Code C3 (Improvement Recommended): Identifies a departure from current standards that does not present danger. A report with C3 observations only results in a Satisfactory assessment.
  • Code FI (Further Investigation Required Without Delay): An inspector cannot confirm whether an unverified circuit is safe. Under Electrical Safety First Best Practice Guide 4 (BPG 4) and standard model form notes, an unresolved FI code mandates an overall UNSATISFACTORY assessment.

Section K of the model EICR has been restructured to clarify reporting categories, separating dangerous departures from observations. Periodic inspection determines whether an installation is in a satisfactory condition for continued safe use; it is not an exercise in enforcing modern design rules onto older safe installations.

On this site: explore the EICR defect classification finder and the guide to applying defect codes under BPG4 Issue 5.

New Chapter on Stationary Secondary Batteries

Amendment 4 introduces a dedicated chapter covering electrical energy storage systems (BESS). It addresses power conversion equipment, bidirectional inverters, and protective devices suitable for current flowing in two directions. Battery location, ventilation, and fire mitigation are covered explicitly.

The practical significance is that storage is treated as a source as well as a load, governing protection and safe isolation.

On this site: see our guides on battery storage, EPS and islanding and G98 and G99 grid notifications.

Section 716: Power over Ethernet (PoE)

Section 716 covers the use of structured data cabling to supply extra-low-voltage DC to equipment such as LED luminaires and IoT sensors. It references the established extra-low-voltage limits of Regulation 414.4.5: 60 V ripple-free DC in normal dry locations and 30 V ripple-free DC elsewhere, provided large-area contact of live parts is not expected. It also imposes temperature rise thresholds to prevent cable bundles from overheating under sustained current delivery.

On this site: review 24 V DC, PELV and SELV distribution and the DC voltage drop sizer.

Section 710: Medical Locations Update

Section 710 has been revised to align with IEC 60364-7-710:2021. Medical locations continue to be classified into Group 0, Group 1, and Group 2 areas, with updated requirements for medical IT systems, insulation monitoring devices (IMDs), dual independent supplies, and UPS changeover systems in Group 2 critical care spaces.

Protective Neutral Bonding (PNB)

Protective Neutral Bonding (PNB) is a long-standing DNO variant of TN-C-S earthing where the neutral-to-earth bond is made at or near the consumer terminal cut-out rather than back at the distribution substation transformer. Amendment 4 formally recognises this supply arrangement with a dedicated checkbox on model certificate schedules.

On this site: see panel earthing and bonding, the adiabatic CPC calculator, and the RCD toroid physics simulation.

Timeline

15 Apr 2026Amendment 4 published by the IET and BSI
15 Oct 2026Mandatory for new work: BS 7671:2018+A4:2026 becomes current standard for new certificates

Authoritative Sources

This page reports what changed and when, with authoritative sources. It does not replace competent engineering judgement. Always work from the published standard and your competent person scheme provider's guidance.