Printable Electrical Field Checklists
HSE GS 38 (4th Edition) is guidance, not statutory law, but it is the benchmark the Health and Safety Executive uses to judge whether your test probes, leads, and voltage indicators are fit for purpose under the Electricity at Work Regulations 1989: Regulation 4(4) for suitable equipment, Regulation 13 for secure isolation, and Regulation 14 for work on or near live conductors. Follow it and you have verifiable evidence that you work compliantly. Below are four printable field checklists for GS 38 safe isolation, BS 7671 minor works, BS 5266 emergency lighting, and BS EN 60204 motor panel QC, formatted for clipboard and noticeboard use.
HSE GS38 SAFE ISOLATION VERIFICATION CHECKLIST
Electricity at Work Regulations 1989 (EAWR Regs 12, 13 & 14) • HSE Guidance Note GS38
10-Step Sequential Verification Procedure
| Step | Check | Required Safety Action & Standard Procedure | Initials / Time |
|---|---|---|---|
| 1 | Permission & Consultation: Inform duty holder and occupants of isolation. Confirm permission to isolate supply without operational disruption. | _______________ | |
| 2 | Identify Point of Isolation: Verify correct circuit-breaker, switch-disconnector, or distribution board using verified drawings and asset labels. | _______________ | |
| 3 | Open Isolator / Switch: Switch the local switch-disconnector or circuit protective device to the open (OFF) position. | _______________ | |
| 4 | Lock Off & Retain Key: Secure the isolator in the OFF position using an approved lockout hasp and unique-key safety padlock. Retain key on your person. | _______________ | |
| 5 | Attach Warning Notice: Fix a prominent warning tag stating your name, contact phone number, date, and reason for lockout. | _______________ | |
| 6 | Prove Voltage Indicator (Pre-Check): Test an approved 2-pole voltage detector (BS EN 61243-3 / GS38 with <= 4mm exposed tips and finger guards) against a known proving unit. | _______________ | |
| 7 | Test All Conductors Dead: Measure between all line conductors, neutral, and protective earth at point of work: L1-L2, L2-L3, L3-L1, L1-N, L2-N, L3-N, L1-E, L2-E, L3-E, N-E. | _______________ | |
| 8 | Re-Prove Voltage Indicator (Post-Check): Immediately re-test voltage detector against proving unit to confirm tester remained 100% operational during verification. | _______________ | |
| 9 | Check Secondary / Stored Energy Sources: Confirm absence of backfeeds from UPS systems, PV inverters, standby generators, or charged DC capacitors. | _______________ | |
| 10 | Commence Work / Permit Sign-Off: Safe working area established. Conductors proven dead. Safe to commence electrical intervention. | _______________ |
Electrician / Inspector Signature:
I confirm that safe isolation has been executed strictly in accordance with EAWR 1989 and HSE GS38.
De-Isolation & Handover Signature:
Lockout padlock removed and installation safely re-energised following successful verification.
MINOR ELECTRICAL INSTALLATION WORKS TEST SCHEDULE
BS 7671:2018+A4:2026 • Part 6 (Inspection and Testing of Minor Additions and Alterations)
Section 1: Description of Minor Works & Circuit Parameters
| Description of Work: | ____________________________________________________________________________________ | ||
| DB Designation / Way: _______________ | Device Type & Rating: MCB / RCBO Type ____ / ____ A | Breaking Capacity: ____ kA | Conductor CSA: Live: ____ mm² / CPC: ____ mm² |
Section 2: On-Site Test Results Schedule
| Continuity (Ω) | Insulation Resistance (MΩ @ 500V DC) | Loop & Fault | RCD Operating Characteristics | |||||
|---|---|---|---|---|---|---|---|---|
| r1, rn, r2 (Ring) | R1 + R2 | R2 (Wander) | Live to Live | Live to Earth | Neutral to Earth | Measured Zs (Ω) | Trip @ 1× IΔn (ms) | Trip @ 5× IΔn (ms) |
| r1: ____ rn: ____ r2: ____ | ________ Ω | ________ Ω | ________ MΩ | ________ MΩ | ________ MΩ | ________ Ω (Max: _____ Ω) | ________ ms (Max 300 ms) | ________ ms (Max 40 ms) |
Declaration of Conformity:
I certify that the minor works detailed above comply with BS 7671:2018+A4:2026 and do not impair existing installation safety.
Inspector Name & Qualification:
Name: ________________________ • Position: ________________________
EMERGENCY LIGHTING 3-HOUR DISCHARGE INSPECTION LOG
BS 5266-1:2016 • BS EN 50172 / BS 5266-8 (Annual Full Duration Test Register)
Luminaire Inspection & 3-Hour Discharge Schedule
| Unit ID | Luminaire Location / Room | Type (M/NM) | LED Charge | 1-Hr Check | 3-Hr Check | Result | Defects & Actions |
|---|---|---|---|---|---|---|---|
| EL-01 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
| EL-02 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
| EL-03 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
| EL-04 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
| EL-05 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
| EL-06 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
| EL-07 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
| EL-08 | ___________________________ | M / NM | [ ] OK | [ ] PASS | [ ] PASS | P / F | ___________________________ |
Engineer Completion Signature:
I confirm that all luminaires above underwent a continuous 3-hour discharge test in compliance with BS 5266.
Premises Handover & Re-charge Verification:
Main normal lighting restored and battery charging circuits operational (allow 24h recharge for full autonomy).
MOTOR & CONTROL PANEL COMMISSIONING & QC SHEET
BS EN 60204-1:2018 (Machinery Electrical Equipment) • BS EN 60034 • PUWER 98
Pre-Energisation Cold Checks
| Check | Inspection Item / Testing Requirement | Measurement / Value | Status |
|---|---|---|---|
| Shaft Coupling & Foundation Bolt Torque: Foundation bolts, coupling alignment, and terminal box screws torqued to manufacturer specification. | Specified: _______ Nm | [ ] PASS | |
| Winding Resistance Balance: Measure phase-to-phase cold resistance balance (U1-U2, V1-V2, W1-W2) with calibrated micro-ohmmeter. | U: ____ Ω • V: ____ Ω • W: ____ Ω | [ ] PASS | |
| Insulation Resistance (Phase to Earth): Test at 1000V DC for 1 minute (>= 200 MΩ required under BS EN 60034-1). | Measured: ________ MΩ | [ ] PASS | |
| Thermal Overload Relay Setting: Dial set to match motor nameplate full load current (or FLC x 0.58 for Star-Delta starters). | Dial Set: ________ A | [ ] PASS | |
| Safety Interlocks (BS EN 60204-1 §9.2): Emergency stop Category 0/1 hardwired trip test and anti-restart interlock verification. | Cat 0 / Cat 1 / STO | [ ] PASS |
Live Energisation Running Tests
| Check | Live Running Verification Parameter | Measured Value | Status |
|---|---|---|---|
| Phase Sequence & Rotation: Confirm shaft rotation matches machine direction arrow using phase sequence meter. | L1 to L2 to L3 [CW / CCW] | [ ] PASS | |
| Running Currents (Full Load): Measure line current on all 3 phases under operating load with calibrated clamp meter. | IL1: ____ A • IL2: ____ A • IL3: ____ A | [ ] PASS | |
| Bearing Temperature & Vibration: Check for abnormal acoustic noise, bearing temperature rise, or excessive vibration. | Drive: ____ °C • Non-drive: ____ °C | [ ] PASS |
Commissioning Engineer:
I verify that this drive train and control panel meet BS EN 60204-1 safety standards.
Production / Plant Manager Sign-off:
Equipment accepted for operational service.