Back to Tools DirectoryCommercial EV Charging Guide

Commercial EV Dynamic Load Management & Curtailment Sizer

Avoid costly DNO network reinforcement and main cut-out fuse failure. This tool models dynamic curtailment waterfalls under peak building demand, enforces the IEC 61851-1 6A minimum pilot floor, and evaluates three-phase neutral conductor loading under single-phase charging diversity per BS 7671:2018+A4:2026 Section 722.

Statutory Regulation 722.311: Diversity may only be applied to EV charging equipment where an automated load management system monitors incomer demand and dynamically curtails charging current.
1-Click Quick Presets:Tap for instant on-site sizing
Select a preset above to auto-fill common circuit values
1. Building Supply & Baseline Demand
Building Baseline Demand (A / phase)110 A
Measured peak demand from half-hourly data or maximum CT logging.
2. Connected EV Fleet
Active Vehicles Requesting Charge8 EVs
Vehicles actively communicating via IEC 61851-1 pilot line.
BASIS: BS 7671 §722.311 & IEC 61851-1Equal Share · 6A Floor
Allocated Current per Active Bay
--.-A
Headroom: --.- A / phase · Cut-Out Limit: --.- A
Charging Speed--.- kW
Queue State--
Neutral Current--.- A
Evaluating DLM dynamic curtailment waterfall...
INCOMER CAPACITY UTILISATION0%
Base Load Allocated EV Safety Reserve
BS 7671 Reg 722.311 Dynamic Curtailment Assessment:
Calculating boundary justification...
Site Headroom Buffer & DLM Protocol AdjustmentsStandard: 10% Buffer · 6A Floor · Equal Share
Show Full Mathematical Derivation (AM2 Working Standard)
ClauseFormulaSubstitutionResult
BS 7671 §722.311I_trip = I_supply × Buffer--
IET CoP 5th EdI_avail = max(0, I_trip - I_base)--
BS 7671 §722I_uncon = (⌈N7/3⌉ × 32) + (N22 × 32)--
IEC 61851-1 §6.4I_alloc = I_avail / LoadUnits--
BS 7671 §523.6.3I_N = √(∑I² - ∑I_i·I_j)--
IEC 61851-1 FloorI_alloc ≥ 6.0 A (Pilot Minimum)--
Plant-Room Engineering Advisory: Dynamic Load Management controllers operating under BS 7671 Section 722 must incorporate dedicated fail-safe defaults (dropping connected vehicle current to ≤6A or zero) within 5 seconds if communication with incomer CT monitoring equipment is interrupted.
Statutory Standards: BS 7671:2018+A4:2026 Section 722.311 • IET Code of Practice 5th Edition • IEC 61851-1 • ENA EREC G100 Issue 2