Back to Tools DirectoryIndustrial Motor Starting Guide

Generator Sizing Calculator

Sizing an emergency generator based purely on steady-state running kilowatts leads to catastrophic voltage collapse. On sites with motor drives, the required alternator capacity is almost always governed by the largest motor starting inrush. This tool calculates both steady and transient demands under ISO 8528 and BS 7671 Section 551, identifying which constraint dictates the physical machine rating.

Statutory ISO 8528 Duty Class Rule: Emergency Standby Power (ESP, 1.0) is for utility outage backup only. Prime Running Power (PRP, 0.90) allows variable load with unlimited hours. Continuous Operating Power (COP, 0.70) is mandated for 24/7 unvarying baseload generation.
1-Click Quick Presets:Tap for instant on-site sizing
Select a preset above to auto-fill common circuit values
1. Steady-State Running Demand
2. Largest Starting Motor Inrush
Largest Motor Rating (kW)15 kW
Rated mechanical shaft output of the largest single motor starting against the set (0 if none).
Motor FLC: 30.1 AStarting Step: 135.4 kVA
BASIS: ISO 8528-1 & BS 7671 §551ESP Standby Duty (K = 1.00)
Minimum Generator Capacity Sizing
226kVA
Active Output: 181 kW at 0.80 pf
Running Demand56.3 kVA
Peak Starting170.8 kVA
Governed ByStep Load
Steady Baseload60.0% Single Step LoadAlternator Limit
0% (Light)60% (ISO 8528 Knee)100% (Trip Point)
Environmental & Derating Adjustments
Altitude Derate: 0.0% · Temperature Derate: 0.0% · Net Capacity Available: 100.0%
Why Motor Step Load Governs Generator Selection:
Why not size for 56 kVA running demand? Starting a 15 kW motor direct-on-line requires 135 kVA of instantaneous step load. On a 56 kVA set, this step represents 241% of capacity, triggering immediate engine stalling and severe busbar voltage collapse per ISO 8528-5.
Site Conditions & Environmental DeratingsStandard (400V · 0.80 pf · 60% Step · ESP Standby · 25°C)
Show Full Mathematical Derivation (ISO 8528 & BS 7671 §551)
ISO 8528-1 / ISO 8528-5
Step-by-step engineering workingTransparent first-principles maths
Step 1 · Continuous Steady-State Demand

Base Running Apparent Power

S_running = P_running / pf
45 kW / 0.80 pf → 56.3 kVA
ISO 8528-1:2018 Clause 7 · Steady-State Apparent Power
Step 2 · Motor Starting & Inrush Demand

Motor Full-Load Current & Starting kVA Step

S_start = [P_motor / (pf × η)] × (k_dol × starter_factor)
[15 kW / (0.80 × 0.90)] × 6.50 → 135.4 kVA
ISO 8528-5:2018 Clause 13 · Motor Starting Inrush Step Loading
Step 3 · Alternator Step-Load Sizing

Single-Step Alternator Acceptance Threshold

S_step_req = S_start / (step_limit_pct / 100)
135.4 kVA / 0.60 step limit → 225.7 kVA
ISO 8528-5:2018 Class G2 Dynamic Response Knee
Step 4 · Environmental Derating & Final Capacity

Net Sizing Capacity with ISO Duty Cycle

S_gen = max(S_running, S_peak, S_step_req) / [Duty × (1 - C_derate)]
max(56.3, 170.8, 225.7) / [1.00 × (1 - 0.00)] → 226 kVA
BS 7671:2018+A3:2024 Reg 551.4 · ISO 8528-1 ESP Selection
Worked Example & Engineering Rationale: Commercial Water Boosting

Design Scenario: A commercial distribution hub operates a 45 kW baseline running demand at 0.80 pf, with a 15 kW lift pump starting direct-on-line (DOL).

  • Running Demand: 45 kW / 0.80 = 56.3 kVA.
  • Motor Input & FLC: 15 kW motor at 90% efficiency draws 16.7 kW input (30.1 A FLC at 400 V).
  • Direct-On-Line Inrush: At 6.5x FLC inrush, the starting surge draws 135.4 kVA.
  • Step Load Alternator Sizing: Standard alternators accept a maximum 60% transient step load without stalling. Therefore: 135.4 / 0.60 = 225.7 kVA.
  • Governing Outcome: Sized at 226 kVA (governed by motor starting step load, not running demand). If converted to Star-Delta or Soft Start, required capacity drops from 226 kVA down to 81–101 kVA.
Formula & factors cross-checked against ISO 8528-1 / ISO 8528-5. Free of black-box approximations.
Alternator Transient Response & Non-Linear Loads:This instrument evaluates steady and step-loading boundaries per ISO 8528. Real-world generator sizing also depends on alternator subtransient reactance (Xd"), step load application sequencing, and harmonic crest factors introduced by large UPS units or variable speed drives. Always obtain manufacturer generator transient data sheets for site installation sign-off.

Standards reference: ISO 8528-1:2018 (Duty ratings ESP, PRP, COP), ISO 8528-5:2018 (Transient starting performance), BS 7671:2018+A3:2024 Section 551.