Back to Tools DirectorySolar & Battery Grid Connections Guide

Commercial Solar PV, Battery Storage & EV Sizer

Integrate onsite renewable generation and battery storage (BESS) to charge electric vehicle fleets without exceeding agreed network import or export capacities. This tool sizes the battery buffer, determines your statutory DNO connection pathway (G98 vs G99), and models ENA EREC G100 export limitation failsafe timing.

DNO Regulatory Gate: Systems with aggregate generation exceeding 16A per phase (3.68 kW 1-ph / 11.04 kW 3-ph) require formal G99 advance approval before commissioning. ENA G100 schemes must achieve failsafe curtailment within 5.0 seconds.
1-Click Quick Presets:Tap for instant on-site sizing
Select a preset above to auto-fill common circuit values
1. Supply & Solar PV Capacity
Solar PV Array Capacity (kWp)50 kWp
Total installed DC nameplate rating of the rooftop/ground array.
2. Battery Storage (BESS) & EV Fleet
Battery Storage Capacity (kWh)60 kWh
Nominal usable storage capacity of the commercial battery bank.
Daily EV Fleet Energy Requirement (kWh/day)180 kWh/d
Combined daily battery recharge requirement across all fleet vehicles.
BASIS: ENA EREC G98 / G99 & ENA G100400V 3Φ · 80.0 kW Total Inverter
EV Fleet Solar & Storage Offset
--%
Clean Energy: --.- kWh/d · Grid Import: --.- kWh/d
DNO Phase Current vs Statutory Limits115.5 A/ph (G99 Formal Study)
0 A16 A (G98)32 A (Fast-Track)72 A (50 kW)150 A+
DNO Application Route & G100 Export Scheme
DNO Form / TimelineForm A2-2 · 65-90d
ENA G100 Export SchemeCurtail ≤ 15 kW (5.0s)
DNO Regulatory Classification Rationale:
Calculating regulatory boundary justification...
BESS Inverter, Agreed Export Limit & Sun HoursStandard Grid (400V 3Φ · 15 kW Export · 2.8 Sun-Hours)
Show Full Mathematical Derivation (AM2 Working Standard)
Standard ClauseFormulaSubstitutionResult
ENA EREC G99 §6P_total = P_pv + P_bess--
ENA EREC G98 §6.1I_ph = (P_total × 1000) / (√3 · V)--
ENA EREC G100 §4t_failsafe ≤ 5.0 s (Curtailment)--
BS 7671 §712E_solar = P_pv × h_sun × η_ac--
BS 7671 §722P_net = max(0, P_ev − P_bess)--
DNO Fast-Track Note (ENA EREC G99 Section 6.2): If the combined capacity of solar and battery storage is restricted so that simultaneous export can never exceed the export limitation threshold, certain DNOs offer streamlined assessment under Fast-Track Form A1-2.
Statutory Standards: ENA EREC G98 Issue 1 • ENA EREC G99 Issue 1 Amd 9 • ENA EREC G100 Issue 2 • BS 7671:2018+A4:2026 Section 712 & 722
Sparks Switchboard