Back to Tools DirectoryHarmonics in Industrial Distribution Guide

Harmonic Mitigation & EREC G5/5 Sizer

Non-linear rectifiers in variable speed drives, EV rapid chargers, and LED arrays inject harmonic currents that distort grid voltage, overheat distribution transformers, and trigger destructive parallel resonance in power factor correction capacitors. This tool evaluates $THD_I$, calculates PCC voltage distortion against ENA EREC G5/5 planning limits, and detects capacitor bank resonance traps.

Statutory Planning Limit: ENA EREC G5/5 enforces a maximum 5.0% Total Harmonic Voltage Distortion ($THD_V$) at low-voltage Points of Common Coupling (PCC). Installations exceeding 12 kVA aggregate non-linear load require formal Stage 2 verification.
1-Click Quick Presets:Tap for instant on-site sizing
Select a preset above to auto-fill common circuit values
1. Connected Plant Load & Rectifier Type
30.0 kVA
Aggregate 3-phase kVA drawn by VFDs, DC rectifiers, or EV chargers.
Governs harmonic current emission spectrum (5th, 7th, 11th, 13th).
2. Supply Network & PCC Baseline
1.5%
Existing background voltage distortion measured at PCC (typically 1.0% to 2.5%).

PCC Voltage Distortion & G5/5 Status

Total Voltage Distortion at PCC (THDv)
1.6%
G5/5 Status: PASS STAGE 1Filter Sizing: 15 A AHF
Current Distortion (THDi)28.0%with 3% AC line reactor
Short-Circuit Ratio (Rsc)333G5/5 threshold: Rsc ≥ 33
PCC THDv vs G5/5 Planning Limit (5.0%)1.6% (Pass)
0% Clean2.5% Target5.0% Statutory Max
Mitigation Strategy:3% AC line reactors adequate. Grid harmonic distortion within G5/5 5% planning level.
Capacitor Bank (PFC) & Transformer ImpedanceStandard (No PFC · Z = 5.0%)
Capacitor bank rating at 400V. Enter 0 if no PFC capacitors are connected.
Nameplate impedance % (typically 4.75% to 5.25% for 500-1000 kVA).

Glass-Box AM2 Derivation: First-Principles Harmonic Compliance Pad

Step-by-step mathematical verification derived per ENA EREC G5/5 Section 6 and BS EN 61000-2-4 disturbance criteria.

Step 1: Prospective Fault Level (Ssc)
Ssc = Tx_kVA / (Z% / 100)
500 kVA / 0.05 = 10,000 kVA (10.0 MVA)
Step 2: Short-Circuit Ratio (Rsc)
Rsc = Ssc / Sload ≥ 33
10,000 kVA / 30.0 kVA = 333.3 (Pass ≥ 33)
Step 3: PCC Total Distortion (THDv)
THDv = sqrt(BG^2 + ΣVh^2) ≤ 5.0%
sqrt(1.5%^2 + 0.35%^2) = 1.6% (Pass)
Step 4: AHF Mitigation Sizing
Iahf = Ib × THDi × 1.20
43.3 A × 28% × 1.20 = 15 A