Under BS 7671 Regulation 311.1, the maximum demand of an installation must be assessed. When adding major loads such as EV chargers or heat pumps, Regulation 132.16 mandates verifying that existing supply equipment, including the distributor's cut-out fuse, is adequate. This engine calculates diversified demand under IET On-Site Guide Table A2 (Household) and evaluates continuous service head headroom.

Plant-Room Ready: This calculator caches to your device and works 100% offline. All calculations execute locally with zero tracking and sub-millisecond reactivity.
1-Click Quick Presets:Tap for instant on-site sizing
Select a preset above to auto-fill common circuit values
1. Incoming Supply & DNO Cut-Out
2. Cooking Appliances & Showers
3. Final Socket Circuits (Appendix 15)
4. Modern Decarbonised Loads
BASIS: BS 7671 Table A2 (Household)230V 1Φ · U0
Assessed Maximum Demand (Table A2)
--.-A
--.- kVA · Diversity Factor: --%
CALCULATING
Service Fuse Capacity Utilisation0.0% (0.0 A Headroom)
0%80% Continuous Threshold100% Fuse Rating
Service Cut-Out Boundary Check:
Calculating boundary justification...
Itemised Circuit Demand Breakdown
CircuitConn (A)Dem (A)
Lighting--
Cooking--
Space Heating--
Showers--
Sockets--
Heat Pump--
EV Charger--
Site Conditions & Secondary Load AdjustmentsStandard Domestic: 600W Lighting · Gas Space Heat · No 2nd Shower
Show Step-by-Step Mathematical Derivation (AM2 Working Standard)
ClauseFormulaSubstitutionResult
Table A2 (1)I_light = 0.66·(P/U0)--
Table A2 (3)I_cook = 10 + 0.30·(FLC-10)--
Table A2 (2)I_heat = 10 + 0.50·(I-10)--
Table A2 (5)I_water = 1.0·I1 + 1.0·I2--
Table A2 (9)I_sock = I1 + 0.40·Σ(other)--
Reg 722.311I_ev = 1.00·I_rated--
Reg 311.1I_total = Σ(diversified)--