Solar PV & Battery Storage: G98 vs G99 Sizer
Under ENA Engineering Recommendation G98, generation connected to the distribution network must not exceed 16 A per phase (3.68 kW on single-phase 230V; 11.04 kW on three-phase 400V) to qualify for "Fit and Notify". When adding battery storage to existing solar, total generation capacity often breaches 16 A, legally requiring ENA G99 prior DNO approval before commissioning.
Statutory DNO Gate: You cannot energise or commission a system exceeding 16 A per phase without prior written consent from your DNO. ENA G100 export limitation assists DNO connection assessment but does not reclassify a system with over 16 A installed inverters as G98.